Current and future service System maps 4/27/24

38 Slides7.69 MB

Current and future service System maps 4/27/24

Current system Link light rail Three lines 35 miles 40 stations Connecting Northgate–Angle Lake, Redmond Technology–South Bellevue, Tacoma Dome–St Joseph Sounder trains Two lines 83 miles 12 stations Connecting Everett–Seattle and Lakewood–Seattle ST Express buses 24 express routes on regional freeway corridors 2

Voter-approved system Link light rail Five lines 116 miles 83 stations Sounder trains Two lines 91 miles 14 stations Stride bus rapid transit Three lines 45 miles on I-405 and SR 522 Serving 12 cities and connecting to light rail in Shoreline, Lynnwood, Bellevue, and Tukwila 3

ST system maps: Link, Stride, Sounder (service opening sequence)

Current system Link light rail Three lines 35 miles 40 stations Connecting Northgate–Angle Lake, Redmond Technology–South Bellevue, Tacoma Dome–St Joseph Sounder trains Two lines 83 miles 12 stations Connecting Everett–Seattle and Lakewood–Seattle ST Express buses 24 express routes on regional freeway corridors 5

August 2024 Link light rail 1 Line extends north to Shoreline, Mountlake Terrace, and Lynnwood. 6

2025 Link light rail 2 Line connects west to Mercer Island and downtown Seattle, and north to Lynnwood. Two new 2 Line stations serving Marymoor Village near Marymoor Park, and in Redmond’s downtown residential and retail core. 7

2026–2027 Link light rail 1 Line stretches south to serve Kent/Des Moines and Federal Way. New station opens at NE 130th Street. NE 130th St Sounder trains P P P 8 2026: New parking garage and access upgrades at Sumner Station. 2027: New parking garages and access upgrades at Kent and Auburn stations.

2028–2029 Stride bus rapid transit 9 2028: S1 Line launches on I-405, serving Bellevue to Burien and connecting to light rail at Bellevue Downtown and Tukwila International Blvd stations. 2028: S3 Line opens, serving communities along SR 522 between Shoreline and Bothell and connecting to light rail at Shoreline South/148th Station. 2028-2029: S2 Line extends north on I-405, serving Lynnwood to Bellevue and connecting to light rail at Lynnwood City Center and Bellevue Downtown stations.

2030–2031 Link light rail 2031: Two new 1 Line stations open at South Graham Street and South Boeing Access Road. Graham St Boeing Access Rd 10 Sounder trains 2030: Improved walking, rolling, biking, and transit connections to South Tacoma and Lakewood stations.

2032 Link light rail The 3 Line opens from SODO to West Seattle with three new stations. 11

2034-2035 Link light rail 2035: The 1 Line extends to Federal Way, Fife, and Tacoma with four new stations. Sounder trains 2034: Parking and access improvements at Edmonds and Mukilteo stations. 12

2037 Link light rail 1 Line and 2 Line service extend to Mariner and SW Everett. 13

2039 Link light rail New downtown Seattle light rail tunnel opens and 1 Line service extends from Ballard to Tacoma. 3 Line service extends north to SW Everett and connects south to West Seattle. 14

2041 Link light rail 3 Line service extends north to Everett. T Line service adds six more stations and connects to Tacoma Community College. 15

2044-2045 Link light rail 2044: The 4 Line opens from South Kirkland to Issaquah with four new stations and 2 Line connections through downtown Bellevue. Sounder trains 2045: S Line service extends south with two new stations in Tillicum and DuPont. 16

Link system maps (service opening sequence)

Current system Link light rail 18 Three lines 35 miles 40 stations Connecting Northgate–Angle Lake, Redmond Technology–South Bellevue, Tacoma Dome–St Joseph

2024 (August) Link light rail 1 Line extends north to Shoreline, Mountlake Terrace, and Lynnwood. 19

2025 Link light rail 2 Line connects west to Mercer Island and downtown Seattle, and north to Lynnwood. Two new 2 Line stations serving Marymoor Village near Marymoor Park, and in Redmond’s downtown residential and retail core. 20

2026 Link light rail NE 130 St th 21 1 Line stretches south to serve Kent/Des Moines and Federal Way. New station opens at NE 130th Street.

2031 Link light rail Two new 1 Line stations open at South Graham Street and South Boeing Access Road. S Graham St S Boeing Access Rd 22

2032 Link light rail The 3 Line opens from SODO to West Seattle with three new stations. 23

2035 Link light rail The 1 Line extends to Federal Way, Fife, and Tacoma with four new stations. 24

2037 Link light rail 1 Line and 2 Line service extend to Mariner and SW Everett. 25

2039 Link light rail New downtown Seattle light rail tunnel opens and 1 Line service extends from Ballard to Tacoma. 3 Line service extends north to SW Everett and connects south to West Seattle. 26

2041 Link light rail 3 Line service extends north to Everett. T Line service adds six more stations and connects to Tacoma Community College. 27

2044 Link light rail The 4 Line opens from South Kirkland to Issaquah with four new stations and 2 Line connections through downtown Bellevue. 28

Stride system maps (service opening sequence)

2028 Stride bus rapid transit 30 S1 Line launches on I-405, serving Bellevue to Burien and connecting to light rail at Bellevue Downtown and Tukwila International Blvd stations. Partial S2 Line service opens between NE 85th Street in Kirkland and downtown Bellevue. S3 Line opens, serving communities along SR 522 between Shoreline and Bothell and connecting to light rail at Shoreline South/148th Station.

2029 Stride bus rapid transit 31 The S2 Line extends north on I-405 to Lynnwood, connecting to the S3 Line in Bothell and light rail service at Lynnwood City Center Station.

More map options

Voter-approved system Link light rail Includes stations. Delete this text box before use. Five lines 116 miles 83 stations Sounder trains Two lines 91 miles 14 stations Stride bus rapid transit 33 Three lines 45 miles on I-405 and SR 522 Serving 12 cities and connecting to light rail in Shoreline, Lynnwood, Bellevue, and Tukwila.

Voter-approved system Link light rail Includes stations. Delete this text box before use. 34 Five lines 116 miles 83 stations

Voter-approved system Stride bus rapid transit Three lines 45 miles on I-405 and SR 522 Serving 12 cities and connecting to light rail in Shoreline, Lynnwood, Bellevue, and Tukwila. Includes stations. Delete this text box before use. 35

Voter-approved system Sounder trains Includes stations. Delete this text box before use. 36 Two lines 91 miles 14 stations

Sound Transit District Serving a region of more than 3 million 40% of the state’s population 37

Sound Transit District Serving a region of more than 3 million 40% of the state’s population 38

Back to top button