Briefing on eNaTIS Presented by: Department of Transport 23 May 2007

29 Slides2.75 MB

Briefing on eNaTIS Presented by: Department of Transport 23 May 2007 Portfolio Committee on Transport National Assembly

Award of contract RT1194KA Tender issued Nov 2000, closed Feb 2001 Awarded to Masiye Phambili (Tasima) in Jul 2001 Contract RT1194KA signed on 3 December 2001with Tasima (Pty) Ltd Decision to award to Tasima was challenged in High Court in Feb 2002 after temporary interdict was given in Dec 2001 High court dismissed application with costs Effective date re-scheduled to 1 June 2002 after interdict application 2 Portfolio Committe on Transport (National Assembly)

Risks remaining on NaTIS Source code compromised Ageing technology cannot be maintained Decline in specialised resources Non-industry standard configuration NaTIS contract open ended with no expiry date, Treasury requested new tender be issued Continuing with the eNaTIS would have been against direct instructions from treasury 3 Portfolio Committe on Transport (National Assembly)

Reasons for eNaTIS The old NaTIS was 14 years old Based on distributed network of servers Old technology mostly end-of-life already High cost of maintenance and development of new features Due to technical limitations the Department of Transport embarked on a technology upgrade project to allow for integrated systems approach On insistence of Treasury/State Tender Board the Department of Transport had to issue new tender 4 Portfolio Committe on Transport (National Assembly)

Reasons for eNaTIS Advantages of Centralised Database Improved data integrity No synchronisation problems between distributed databases Easy data extraction Better security on centralised configuration Lower cost of maintenance and new features Easier to interface with other systems Rapid deployment of new software 5 Portfolio Committe on Transport (National Assembly)

Reasons for eNaTIS Advantages of new software Lower cost of ownership (technical skills more available due to open standards) Easy to update introduce new software Modern Windows-based front-end Standard technology, no proprietary lock-in (Source code protected by independent third party, DoT can rebuild system with source code and documentations placed in safe keeping at third party) Platform independent system can be migrated between various platforms (i.e. Windows, Unix, Linux,) Wide use of open source 6 Portfolio Committe on Transport (National Assembly)

Reasons for eNaTIS Enhancements included Central driving and learner licence booking system User friendly user interface Multiple method of payments Improved auditing and control Blank certificate control (face value forms) 7 Portfolio Committe on Transport (National Assembly)

Reasons for eNaTIS Future enhancements Internet/ATM service delivery Administrative Adjudication of Road Traffic Offences (AARTO) Biometrics, smart card technology and radio frequency tags Business process management with workflow New interfaces with financial institutions Handheld devices for law enforcement 8 Portfolio Committe on Transport (National Assembly)

Contract deliverables Custom developed application based on NaTIS release 76 2000 work stations at 684 sites (incl one year on-site support) Data centre and Disaster recovery centre for 2001 specifications and expected growth Data migration from old NaTIS National Call Desk 9 Provincial help desks Project Office, Business Office 9 Portfolio Committe on Transport (National Assembly)

Scope expansion The custom developed application required 9 additional releases of old NaTIS New functionalities required for eDate was identified 50% more user stations (from 2000 to 3000) Almost 90% growth in sites (from 684 to 1270) Vehicle population grew by 53% Database storage requirements more than doubled 1 Portfolio Committe on Transport (National Assembly)

Contract governance National Steering Committee governs project: – Department of Transport – 9 Provinces – RTMC Formal change control mechanism Formal project management in terms of international best practice 1 Portfolio Committe on Transport (National Assembly)

Contract period & Value Contract period: 5 years Effective Date:1 June 2002 Contract Value: R354 million including VAT plus: – Imported items linked to foreign exchange fluctuations – Resources linked to CPI Current adjusted contract value is R408 million 1 Portfolio Committe on Transport (National Assembly)

Technical complexity 4.6 billion data records 1270 sites 3000 PC workstations Total rewrite of 303 transactions Re-alignment of specifications and old NaTIS source code Confirmation of business processes 1 Portfolio Committe on Transport (National Assembly)

NaTIS Network Architecture NATIONAL INDEX NI PROVINCIAL DATABASE eNaTIS Network 9 Provincial Servers EXTERNAL INTERFACES Regional Server Workstations Regional Server Workstations 14 REGIONAL SERVERS 1 Portfolio Committe on Transport (National Assembly) External Institution Sever

eNaTIS Architecture NATIONAL CALL CENTRE eNaTIS NETWORK OVERVIEW PROVINCIAL CALL CENTRES & LAW ADMINISTRATION SITES Print/File Server eNaTIS Network Server DATA CENTRE/DISASTER RECOVERY SITE Workstations REGISTERING AND LOCAL AUTHORITIES, TESTING STATIONS AND TESTING CENTRES EXTERNAL INTERFACES External Institution Sever Print/File Server Server 1 Portfolio Committe on Transport (National Assembly) Workstations

Changeover Concept 1 National Index Old NaTIS National Index 9 Provincial Databases Dedicated lines External Systems Provincial Database Regional Database Regional Database Dedicated lines Old Dumb Terminals Provincial Database Regional Database 14 Regional Databases eNaTIS Telkom VPN Supreme Centralised Data Centre 1 Telkom VPN Supreme Portfolio Committe on Transport (National Assembly) New User Interface

Changeover to eNaTIS Data migration of total database New hardware platforms (replacement) New database technology New application software New user interface New external interface software New network (with temporary re-use of portions of old network) 1 Portfolio Committe on Transport (National Assembly)

Changeover preparation Old NaTIS – 14 regional servers eNaTIS – centralised server Specifications Release 76 Release 76 684 sites with 2000 users Tender baseline – June 2002 Development of Release 76 functionality 9 new releases 9 new releases New functionality Migrate 4.6 billion records and 600 tables Migrate Datafix Serve public 1 Procure hardware and establish data centre Data centre upgrade Deploy PCs on sites Deploy an additional 1000 PCs on 586 new sites Performance testing 12 data load tests (apply data migration scripts) Add additional application servers Dry runs 1 Provincial 2 National Hardware upgrade additional database server Portfolio Committe on Transport (National Assembly) Deploy Telkom VPN Supreme networks Deploy 3G network

Changeover Old NaTIS – 14 regional servers eNaTIS – centralised server eNaTIS Ready – 4 April 2007 Close transactions – queries only Final data migration Shutdown old systen eNaTIS Live – 12 April 2007 Heavy load database constraints Replace application servers Interventions Add new database server eNaTIS Fully Operational – 8 May 2007 1 Portfolio Committe on Transport (National Assembly)

Initial challenges Total system (all users) are dependant on sufficient database server capacity Overload of single node occurred when spikes were experienced As result other two nodes started waiting for overloaded server to respond Effect: ALL users experienced slow response times – bottleneck of total database access 2 Portfolio Committe on Transport (National Assembly)

Data Centre Constraints 2 Portfolio Committe on Transport (National Assembly)

Interventions Installed fourth database server Analysed all aspects of Oracle database layers for optimisation Optimised and adjusted various settings and physical disk storage parameters 2 Portfolio Committe on Transport (National Assembly)

Current status Old NaTIS performed average of 287,000 transactions per day (Mar 07) Between 13 April and 7 May eNaTIS performed average 326,000 transactions per day (13,4% more) with 93% uptime After interventions (since 8 May 07) eNaTIS performed average 619,000 transactions per day (115% more) with 100% uptime 2 Portfolio Committe on Transport (National Assembly)

NaTIS and eNaTIS Latest eNaTIS weekday average 800,000 700,000 C h a n g e o v e r 500,000 400,000 NaTIS weekday average Initial eNaTIS weekday average i n t e r v e n t i o n s p e r i o d 300,000 200,000 100,000 Days 2 Portfolio Committe on Transport (National Assembly) ay -0 7 15 -M 8M ay -0 7 1M ay -0 7 24 -A pr -0 7 17 -A pr -0 7 10 -A pr -0 7 3Ap r-0 7 ar -0 7 27 -M ar -0 7 20 -M 13 -M ar -0 7 0 6M ar -0 7 No of transactions 600,000 D a t a b a s e

Project management Project governance model was deployed by internationally recognised company Model is based on PMI (Project Management Institute) PMBOK (Project Management Body of Knowledge) National Steering Committee governs the project with formal change control Full-time project office to perform administration, scheduling and control Project health check performed 2 Portfolio Committe on Transport (National Assembly)

Methodologies Project Management: PMBOK Software Development: Full implementation of Rational Unified Process (RUP) from IBM In final stages of ISO9001 accreditation 2 Portfolio Committe on Transport (National Assembly)

Project Challenges Initial contract award July 2001 Mission critical system operating in ever changing environment Due to system complexity long development cycle Since release of original tender specification, 100% growth on all aspects (equipment, sites, software requirements) 9 provinces with unique requirements At no stage could business continuity be compromised 2 Portfolio Committe on Transport (National Assembly)

Effects of challenges Increase in price for new sites, new hardware and new software NOT FOR difficulties in completing original baseline Additional requirements on request of provinces and financed by provinces Rescheduling of milestones without exceeding initial contract period Upgrading of originally proposed hardware 2 Portfolio Committe on Transport (National Assembly)

Conclusion Project was delayed from onset with court challenges Massive scope expansions in software requirements, users and sites necessitated rescheduling of milestones Capacity constraints were eliminated ENaTIS is now stable and performs in accordance with requirements 2 Portfolio Committe on Transport (National Assembly)